Preparation

  • Follow all ACI recommendations.
  • Remove all contaminants such as dirt, grease, and loose materials.
  • Profile concrete substrates to a minimum CSP #4; shot blasting is preferred.

Priming

  • Prime with SpecPoxy 1000 at approximately 100 sq. ft. per gallon.
  • Apply using a notched squeegee, broom, or roller.
  • While epoxy is still wet, broadcast coarse dry sand to refusal.
  • Allow to dry for a minimum of 12 hours, then remove loose sand before applying SpecLevel PCT-Gray.

Mixing Instructions

  • Small Batches: Mix 7 pints of water per 50 lb. bag for 3 minutes.
  • Large Batches: For 34 bags, mix for 45 minutes.
  • Pumping: Mix for 3 minutes in the pump’s mixing tank.
  • Extended Mix: Add 15 lbs. of 3/8” pea gravel per 50 lb. bag during the last minute of mixing.

Installation

  • Pour SpecLevel PCT-Gray over the substrate and spread with a long-handled spreader or gauge rake.
  • Self-levels in the first 20 minutes at 70°F.
  • Accepts foot traffic in 24 hours.
  • Use cleated shoes during installation for best results.
View full details

Application

Application

Preparation

  • Follow all ACI recommendations.
  • Remove all contaminants such as dirt, grease, and loose materials.
  • Profile concrete substrates to a minimum CSP #4; shot blasting is preferred.

Priming

  • Prime withSpecPoxy 1000at approximately 100 sq. ft. per gallon.
  • Apply using a notched squeegee, broom, or roller.
  • While epoxy is still wet, broadcast coarse dry sand to refusal.
  • Allow to dry for a minimum of 12 hours, then remove loose sand before applyingSpecLevel PCT-Gray.

Mixing Instructions

  • Small Batches:Mix 7 pints of water per 50 lb. bag for 3 minutes.
  • Large Batches:For 34 bags, mix for 45 minutes.
  • Pumping:Mix for 3 minutes in the pump’s mixing tank.
  • Extended Mix:Add 15 lbs. of 3/8” pea gravel per 50 lb. bag during the last minute of mixing.

Installation

  • PourSpecLevel PCT-Grayover the substrate and spread with a long-handled spreader or gauge rake.
  • Self-levels in the first 20 minutes at 70°F.
  • Accepts foot traffic in 24 hours.
  • Use cleated shoes during installation for best results.

Packaging

50 lb. Bag: Covers approximately 15 sq. ft. at 3/8” thickness.

Shelf Life

  • Shelf Life:12 months in unopened bags stored in a dry facility.
  • Storage:Store in a cool, dry area away from direct sunlight.

Uses

  • Thickness:Apply from 3/8” up to 1.5”. For thickness up to 5”, add pea gravel.
  • High-load Traffic:Floors subject to high-load rubber-wheeled traffic require a minimum of 1/2”.
  • Foot Traffic:Accepts foot traffic within 3 to 4 hours depending on job site conditions.

Test Data

  • Set Time at 70°F (ASTM C266):Initial Set 60 min, Final Set 100 min
  • Compressive Strength (ASTM C109):1 day: 2500 psi7 days: 4000 psi28 days: 5000 psi
  • Bond Strength (ASTM C882 modified):7 days: 1350 psi
  • Flexural Strength (ASTM C348):28 days: 1100 psi
  • Yield/Density:Yield per bag: 0.45 cu-ft (135 lbs/cu-ft)

Cleaning

Clean tools, pumps, and equipment with water before SpecLevel PCT-Gray hardens.