Alkali-resistant, Epoxy Moisture Control Barrier/Primer
MVM Prime 5000 is a two-component, 100% solids epoxy moisture barrier system designed to effectively halt moisture vapor-related issues on concrete before the installation of SpecChem underlayments or overlayments. It also provides an excellent bond to concrete and can be applied to concrete as early as 5 days old, where early application of floor covering is essential.
One-coat epoxy system that is easy to spread and provides excellent coverage.
VOC compliant with zero grams per liter VOC.
Reduces moisture vapor for floor coverings and has an ASTM E 96 rating of 0.06 perms at 14 mils.
Prevents moisture-related problems with floor coverings over concrete floors.
Serves as an excellent primer for SpecChem Underlayments/Overlayments.
Concrete Surface Preparation:
New concrete must be at least 5 days old with all curing compounds and sealers removed, and possess a minimum tensile strength of 150 psi.
Existing concrete must be clean, dry, and sound. Remove all contaminants such as oil, dirt, and unsound concrete.
Concrete surfaces must be mechanically prepared to a minimum ICRI CSP of 3. Acid etching is not acceptable.
Mixing:
Condition all materials to a temperature range of 65°F to 85°F.
Mix Parts A and B separately for one minute using a drill and mixing prop, then combine and mix for an additional 3 minutes to ensure proper chemical reaction.
Placement:
Spread with a squeegee or notched squeegee and back-roll with a roller to improve bond and reduce surface imperfections.
While still fresh, broadcast clean/dry sand over the application to create an ideal bonding surface for underlayment or overlayment systems.
Packaging
Available in 3-gallon units (two 1-gallon Part A resin and one 1-gallon Part B hardener) and 15-gallon units.
Shelf Life
Two years from the date of manufacture when stored properly in original, unopened containers in a cool, dry area away from direct sunlight.
Coverage
Coverage rate is approximately 75-125 sq-ft per gallon, depending on the texture of the concrete surface.
Test Data
Set Time at 70°F (ASTM C266):Initial Set: 12 minutes, Final Set: 15 minutes